11 kv metering is done in my factory.Meter show PF 1.000
but kvarh lag&lead show 24&94 respectively & Avg.PF
is .956 .? is what i do for inproove my PF to 1.000

Answer Posted / arvind

it is very difficult to achive 1 power factor because it
depends on the load. as u said it is 0.956, then it is good
that power factor is almost to 1.

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the advantages of stationary armature and rotating field system?

708


sugest any typical project ?

1378


how is the incoming cable size calculated for a given current rating of a panel??

1441


What are the uses of lead compensator?

603


If a transformer primary winding operates at 240v, the secondary at 120v and the load is 1500w & the transformer is rated at 92% efficient, what's the current flowing through the primary winding of the transformer? What is the formula for finding this?

1739






Differentiate between low pass, high pass and band pass filter?

624


What range of speed can you get with the field control method of speed control of d.c. Shunt motor?

668


What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?

538


How many Zones can be in Conventional type fire alarm system & how can we detect the fire in Conv. type FAS?

1381


What type interview questions ask in Electrical technicians

1266


what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks

1747


I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?

1534


how to read idmt curva

1720


What is Scheme Test of High Voltage Switchgear. Which tests it includes.

1904


what are the disadvantages in GIS over AIS

1927