How does a system control centre in a utility plant gets
the grid frequency of the electrical network (50 Hz or 60
Hz)by the SCADA system?
Answer / jim
SCADA does not control frequency. The source generators produce at 60 cycle. The ultimate load on the grid will never be perfectly matched with the generation. This load mismatch will control the grid frequency by + or - from 60 cycle. Your wall clocks will change speed.
| Is This Answer Correct ? | 0 Yes | 0 No |
71ohm,111ohm,95ohm,179ohm in calculate the total ohm in series circuit
i Have 1000kva 11/.4 kv voltemp make t/f Its a 2 year old. i wants to known how much iron losses & copper loses during no load condition.
what is the difference between scaler and vector control in drive and where it is to be used ?
What is the efficiency during maximum power transfer?
what is mean by potential and potential free contacts
what is relay what is protection & contact multiplying relays where it is used function in brief
Find the octal equivalent for the binary number 101101110
will a fluorescent bulb work when dc is passed through it?? if not why??
What is the RME and explain the full form and what is the RME work?
can we use 400w coke instead of 250w choke in 250w fittings
How can i run three phase bore well motor in 2 phase while i running it by using capacitor its ams increase to 23 ams the distance from motor to stater is 1600 feet
What is the simplest formula to calculate the rotor diameter of a synchronous generator?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)