Answer Posted / er. abhijit sane
Time is at Large when the project is likely to extend
beyond its dead line. Time is at large when there are
events which adversly affect the execution of the works and
result in dealy.
The delays may be due to deficiencies on part of the
Contractor or Owner
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
how many litres of enamel paint required for 5000 sft of site??
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Gidc technical que paper
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
What is a projection line?
What you understand by building codes?
What are the steps involved in the concreting process?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
what is differences between ferrock and concrete ?
what are the types of design? which type of method is used at what type of design & why?
Material calculation of cm 1:6 for 1sqm
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
in design case of structural member best suitrable percentage of steel limit is what