what is periode of deshuttering for different area of slab
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the density and bulk density of cement?
What is the cemnent ratio
What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?
what is the thikness of binding wire please quick response
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
What is difference between nominal mix and design mix?
What is the difference between auto & dumpy level
how to find hardness of water?why it should be determined?
what is the minimum % of steel use in columns ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)