Required Qty of Cement Mortor for 3"x3"x1' groove filling?
Answers were Sorted based on User's Feedback
Answer / s sambasiva naidu
if it is for wet morter the answer is 108 cub.inches
Is This Answer Correct ? | 6 Yes | 0 No |
what is escalation?how it is done?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
why grading of cement is like 33,43,53?why not 25,35,45?
1 Answers Gokaraju Rangaraju Institute of Engineering and Technology GRIET,
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
What is the difference between M20 and M25 concrete?
quantity of sand in cft in 1:6 cement sand mortar
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
pls tell me about method of cutting length of ties column
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,