what is the maximum permissible limit value of leakage
current and leakage counter reading to replace lightining
arrester?
No Answer is Posted For this Question
Be the First to Post Answer
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper
how much capacity(rating) of generator required to operate a load of 100kv.
1) Why distributiion system decided 11 kv, 33 kv, 66 kv, 132 kv, 220 kv, 400 kv, 2) In 3 Phase line terminal of capacitor, why used for power factor improvement. 3) Why used rating KVA in transformer?
what is cathodic protection in Tank,and product pipelines?
we convert 66kv to 33 kv to 11kv to 440v. why can't we directly convert 33kv to 440 ?
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
Why not connect relay Y phase for over current and earth fault
hi can anyone pls tell me the eee interview core questions asked in l&t
3.The slip of an IM UNDER FL condition is about.....
In the Load Test of 3 Phase Squirrel Cage Induction Motor, 2 wattmeters are used. One of the wattmeter deflects in negative diretion during no load. Why?
What is the resonant peak?
working principle of generators?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)