why we put pocket in some structure instead of bolt.

Answer Posted / s.kuppuraj

if we use pockets in the machinery foundation we can adjust
the bolts at fixing time ,but if we directly fix bolt in
case of any mistakes u have to remove the bolt and re do the
entire process

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1445


How can explode a block?

669


how to preaper for interview wat they asked in interview give me idea

2152


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

2633


How did street originate in the plumbing term street ell?

617






Will going from a 3-tap to 6-tap increase water pressure?

634


detailed calculation of the amount of cement used?

1615


What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

1668


2. What are the advantages of your present job, things you like about it?

2700


What is the use of water table & Kreb stone for drain

1351


How to cal. The weight of hollow pipe?

709


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

1957


what is m30 in concrete tiles

1882


how to identify np3 pipe and np4 pipe

1517


what are the layers of the national and heir aprox thickness??

1579