What is cargo planning? How do you do that and what are the
most Important factors that are kept in mind while planning?
No Answer is Posted For this Question
Be the First to Post Answer
advantages and disadvantages of international trade
How can a successful and thorough systems analysis be ruined by a poor system design? Answer the question relative to these factors: a) The impact on the subsequent systems implimentation phase. b: The lifetime of the system after it is placed inti operation c) The impact on future projects
Why we hire you, being a fresher when at the same time we have experinced professionals like CAs, MBAs line up?
4. State & explain the various financial & non- financial incentives to motivate the people in an organisation.
What is the difference between Bank rate and Repo rate?
explain about yourself with your streangth and weakness. and also tell me why do you want to do mba?
what is bpo ?
When will SRCC GBO 2009 result will come?? Does anybody know ??
what is management?
i have been selected for sbi clerical interview, please give me the details, what r the questions i can expect in the interview,send your sugesstions to rathi4chemi@yahoo.com
Q.3. One of the serious problems faced by the Public Enterprise Management in our country is that: (a). Very little managerial autonomy. (b). More bureaucratization (c).Excessiveinvestment. (d). Excess of accountability.
Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.
Business Administration (517)
Marketing Sales (1279)
Banking Finance (3209)
Human Resources (747)
Personnel Management (68)
Hotel Management (29)
Industrial Management (113)
Infrastructure Management (14)
IT Management (97)
Supply Chain Management (16)
Operations Management (39)
Funding (79)
Insurance (494)
Waste Management (1)
Labor Management (48)
Non Technical (73)
Business Management AllOther (546)