Answer / suresh
let the total volume of the concrete is = a
and let the given mix proportion is 1:1.5:3
then the quantity of the
cement required = a*(1.52/(1+1.5+3))m^3 = x m^3
we know that one cubic metre = 1450kg = 29 bags
1 cubic metre = 29 bags
x cubic metre = ?
=(x * 29)/1 bags
now, fine agg = 1.5*x
coarse agg = 3*x
Is This Answer Correct ? | 36 Yes | 9 No |
Answer / brajesh kaurav
let the total volume of the concrete is = a
and let the given mix proportion is =1:1.5:3
then the quantity of the
cement required = a*(1.57/(1+1.5+3))m^3 = X m^3
where 1.57 is loose volume of 1 cum concret.
we know that density of cement = 1440kg/cum
quantity of cement in per cum in bag=1440/50=28.8bag/cum(in
loose volume it consider 30bag)
1 cubic metre = 30 bags
x cubic metre = ?
=(X*30)bag/cum
now, fine agg = 1.5*X(+5% of voids)
coarse agg = 3*X(+1% of voids)
Is This Answer Correct ? | 10 Yes | 8 No |
Answer / jumrik ngomdir
let the total volume of the concrete is = a
and let the given mix proportion is =1:2:4
then the quantity of the
cement required = a*(1.52/(1+2+4))m^3 = (X) m^3
where 1.52 is loose volume of 1 cum concret.
we know that density of cement = 1440kg/cum
quantity of cement in per cum in bag=1440/50=28.8bag/cum(in
loose volume it consider 30bag)
1 cubic metre = 30 bags
x cubic metre = ?
=(X*30)bag/cum
now, fine agg = 2*X(+5% of voids)
coarse agg = 4*X(+1% of voids)
Is This Answer Correct ? | 4 Yes | 2 No |
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
for brickmasonry strengthwise which bond is better?
How to calculate the sand and aggregate in concrete
Why should you consider yourself fit to be hired by jindal steel.
what is compressive strength of concrete?
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
detailed calculation of the amount of cement used?
what is the slump of pile concreting work? give me the value of minimum and maximum value of slump and how give slump in pile?
.want to know the volume of water for 1.2.4 concert mixing ratio
What is the specific weight of sand?
How to plan a project
0 Answers Ahluwalia Contracts, SDS,
hi guys what happens if you are absent for a supplymentry exam?