WHAT IS TEAM SIZE IN CONSTRUCTION WORK

Answer Posted / ghantola

It is the no. of persons alloted to manage the site at managerial, executive and supervisory levels.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where can i get the previous question papers for rrb section enginerr (civil)

1856


What is the use of offset command?

667


What is aggregate?

710


acceptance criteria for concrete works

1673


What is soil enforcement?

783






Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2347


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1283


how to calculate mivan shuttering matrial

952


what is Bearing Capacity,How to determine it?

793


How to fix toll charge for a particular vehicle at toll booths in a highway?

1487


How to calculate the quantity of ingredients of M20 grade concrete?

1512


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1198


Explain the difference between slab and beam?

654


How to get MEP technical,instaaltion & testing data for interview?

1597


What is binding spacing of the rebars at lapping zones.

605