Answer Posted / ghantola
It is the no. of persons alloted to manage the site at managerial, executive and supervisory levels.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the basic difference between OPC
how do we design mix ratio?
how to calculate mivan shuttering matrial
Volume of 25kg putty bag & 40 kg putty bag volume??
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What is Grid floor and mention its advantages ?
it is possiblee to produce concrete with out cracks...
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
please briefly explain calculating or estimating steel quantity for a RCC column?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How to find beam R/F cutting length
How does siphoning work?
what is difference between GTS bench mark and temporary bench mark
what is constat for brickwork