Answer Posted / ghantola
It is the no. of persons alloted to manage the site at managerial, executive and supervisory levels.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
where can i get the previous question papers for rrb section enginerr (civil)
What is the use of offset command?
What is aggregate?
acceptance criteria for concrete works
What is soil enforcement?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
how to calculate mivan shuttering matrial
what is Bearing Capacity,How to determine it?
How to fix toll charge for a particular vehicle at toll booths in a highway?
How to calculate the quantity of ingredients of M20 grade concrete?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Explain the difference between slab and beam?
How to get MEP technical,instaaltion & testing data for interview?
What is binding spacing of the rebars at lapping zones.