Required Qty of Cement Mortor for 3"x3"x1' groove filling?
Answer Posted / s sambasiva naidu
if it is for wet morter the answer is 108 cub.inches
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
How to find out kg per Sft ?
Explain what is zoning permit?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
How much material is required for constructing a 2 Lane 2Km rigid pavement road
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What are the different methods for drawing an arc?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Why should pumping be not used in case of concreting works?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Draw the cross section of a boundary wall and label its part with detailing?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure