Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A 150KW 440V motor is need to replace in the field instead
of faulty one. what are the main parameter should I need to
check?



A 150KW 440V motor is need to replace in the field instead of faulty one. what are the main parame..

Answer / a.p.nanjappa

150kw , 440 is a large motr. the starting current of this
induction motor will be 5-8 times depend on drive ex-fan.
and coast for 6-8s to attain full speed.
so, the new contactor shall be good quality , with
overload,instantaneous with time delay shall be selected.
Reverse rotation protection, vibrations,
Unbalnced current protection optional.
LV power cable terminal box cable connection and support.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How to calculate incomer of a capacitor bank/feeder from its KVAR, AND how to calculate the copper busbar for rated incomer,like for 400A we calculate the 40x10 of aluminum busbar.

1 Answers  


If a motor of 30KW rating &200 mtrs distance from feeder give me the cable size selection calculation?

0 Answers  


WhY PF low at Time of PT Missing in HT Meter

2 Answers   HCL,


Is a current transformer step up or step down ?

2 Answers  


What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?

0 Answers  


why is electricity produced and distributed in multiples of 11. 440V, 11KV, 22KV, 132KV etc

2 Answers   Bhel,


What is the difference between DOL starter and star delta starter

0 Answers  


What is Electrical Engineering?

13 Answers   L&T, NTPC, Wockhardt,


why we take movement of rotor always in counter-clockwise direction in 3-phase induction motors?

0 Answers  


what is the effect of power factor in electrical circuit ? if we mainten power factor near about unity (0.999) our energy consumption Units increase or decrease?

11 Answers   Piramal Healthcare,


why Lightning arrestor are made by 2 seperate stack of inslutor but why cvt are in single stack of insulator.

0 Answers   Siemens,


why we take transformer reading in kva

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)