I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
1365why in some trains in India Electric equipment such as Fans , tube light not work until locomotive or engine is attached to the train ??
1 1980Consider a case that two 200 hp motors are connected to 500KVA transformer. For improving power factor can we add capacitors in common bus bars to motors. Or should we add capacitors for each individual motor?
2 2763transformer cooling fan kharab ho jaye to 1-off kar dena chahiye 2-load kum kar dena chahiye 3-koi frrk nhi padta 4-sub galat hai. choose right option
2 2513RESISTONS R1 AND R2 in parallel = Total R.? 1-R=R1+R2 2-R=1/R1 + 1/R2 3-1/R + R1+R2 R=R1R2/R1+R2 select one
BSNL, PGVCL Paschim Gujarat Vij Company Limited, TCS, Wartsila,
2 3399Post New Electrical Engineering Questions
what is through fault?
What are the different types of controllers?
What kinds of decision are made about CT from it's Knee point(voltage & current)?
hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /
what is the requirement regarding earthing of Single conductor with AWA
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The rotor reactance at stand still is A 2 ohm B 1.25 ohm C 3.15 ohm D 2.25 ohm
how we calculate the withstansing current capacity of wires&cables?
What is installed in PAC that is control the humidity
in dc shunt motor if field winding is shorted then
what is booster? and how it is connected in a circuit?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
what does a string of resistors in a series will do?
What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?
what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.
Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB