why receiving end voltage increases in a system when capacitive load is added

1 3155

what role neutral plays in electrical circuit? If neutral is not there what will be the effect

1 3320

IN MY SYSTEM THERE IS ONLY OVER CURRENT EARTH FAULT RELAY IS AVAILABLE. FOR THE UNBALANCE SENSING IS THERE ANY RELAY IS AVAILABLE? THE SAME CTs WHICH ARE USED FOR THE OVER CURRENT EARTH FAULT RELAY CAN USE FOR UNBALANCE ALSO?

2 2402

how is the testing of an REF relay? what are the test REF circuit having?

Siemens,

1022

Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.

3378

why we connect dg neutral with ground?

1 2008

Can you explain about TEE protection scheme?

Voltech,

1288

if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)

934

How much the fault level of 11 k.v.,22 k.v., 33 k.v. (in Maharashtra- M.S.E.D.C.L) for calculation of short circuit current & selection of h.t.cable.

1 5109

Define Current Transformer? Working & TYpe's Of C.T.

4 3990

What is E.M.F ?

6 4945

I have a question, I visit 01 site and face a problem, there is 2.5 ton Air Con working, when air con compressor is running at that time rectifier voltages are increasing upto 290-295 v and rectifier is giving main high alarm (rectifier is APC single phase, before starting compressor rectifier voltages was 230v. when air con is going off rectifier voltages are decreasing smoothly at its actual voltages 230v. Load on Genset phases is this: Red-13.5 amp AC (Air Con load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp AC (telecom system load), Genset phase to phase and neutral to phase voltages are also ok. These are 10 sites having same system and same rectifier APC brand at every site 02 genset are working but the problem is same at all these 10 sites. What will be the reason behind???

1 2499

I have a question, I visit 01 site and face a problem, there is 2.5 ton Air Con working, when air con compressor is running at that time rectifier voltages are increasing upto 290-295 v and rectifier is giving main high alarm (rectifier is APC single phase), before starting compressor rectifier voltages was 230v. when air con is going off rectifier voltages are decreasing smoothly at its actual voltages 230v. Load on Genset phases is this: Red-13.5 amp AC (Air Con load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp AC (telecom system load), Genset phase to phase and neutral to phase voltages are also ok. These are 10 sites having same system and same rectifier APC brand at every site 02 genset are working but the problem is same at all these 10 sites. What will be the reason behind???

1 1871

what will be efficient rating of ac motor to lift a 10 kg wt of stone to 10 meter height with input 220V AC 50 Hz frequency???

1 3031

What is an 86-P or an 86-A trip

1068


Post New Electrical Engineering Questions






Un-Answered Questions { Electrical Engineering }

The power supplied to a 33microF capacitor from a 120V, 60Hz source will be

1109


How do you determine the size of transformer radiators in a transformer?

1026


Why to keep capacitor bank off while generator running.

811


How to calculate phase to phase difference ?

1281


how to know the diffrential relay setting of 06mva step- down (delta-star)transformer?

1092






size of condotory fron voltage level

1231


What is an order of a system.

248


In the formula : Knee point voltage = Burden X alf / class, Please inform what is alf? regards Shashidhar M.R.

2516


IF HT CAPACITOR IN ON POSITION IS THERE ANY LOSSES I.S I SQURE OCCURS IN THE SYSTEM

1152


define digital electronic

1099


why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)

1527


WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT

1475


What is grid collapse? what is the reason for it?

1065


please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com

944


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

1017