How to calculate Battery back up time for a 400 AH Battery bank having a load of 20 Amps and charging time required to fully charge this battery bank?
2 8042How to calculate battery back up time for a 400 AH battery bank installed in telecom shelter for a load of 20 Amps and time taken to fully charge this battery bank?
3 22026How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set required to cater to this load?
3 40738hy i need help with LabView, I need a sample code of LabView to download serial data from the Intellivue Patient Monitor to PC. Thank you in advance.
1 4786how electical engineer is related to apsrtc (general) post? if they ask a question in interview as why did u choose this job what shd be answer
1 2280a 25kvar capacitor bank connected to the secondary side of transformer.then why the capacitor draws more current then rated
TATA,
3 8267A 400KVA ,50HZ TRANSFORMER IS TO BE OPERATED AT 50HZ.THEN KVA RATING OF THE TRANSFORMER?.
GATE,
4 9117A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
1 2653why the voltage level in transmission line are in multiple of 11kV, 22kV, 33 kV etc..( i.e., 220 V )?
4 8924Post New Electrical Engineering Questions
If not into production, how far did you follow the design and why did not you see it into production?
I want single line diagram for AMF & DG syncronizing panel
What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
please send the IS strandard for electrical to sakthi_murugan86@yahoo.co.in
sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com
send me any model test paper of clerical post of state bank of india.......
please send me latest & previous years question papers for IOCL Technical level questions
What is the magnetic field (coil DC ) of Turbo Expander?
How I can Compare 120v/60Hz versus 220v/50Hz ? Please tell me both advantage and disadvantage ......
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
what is meant by IGBT how they differ from tyristor ?
sir am giving jspl exam on 19th oct . i belong to eee, so plz send previous question papers ..........to dis id abhilash203@gmail.com
Anybody tell me about modbus hex address of l&t trivector meter er300p??I want to read voltage,current,kwh etc via rs485...If anybody have a manual then send on my mail..Brijeshmodi18@gmail.Com