Electrical Engineering Interview Questions
Questions Answers Views Company eMail

where to use CT and PT?

CEB, Reliance,

4 53849

how to use single phase supply for a three phase equipement.

1818

which is dangerous AC or DC?

10 9801

what is diffrential relay used in generator plz give brief explanation

4 5419

what is reverse power relay brief explanation and in b/w where it is connected

1484

which connection is there in a rotor of the motor

All Trades Electrical, HAL,

2 4246

We wish to test 60 Hz systems from a 50 Hz supply. To acheive frequency conversion, we use a VFD. The VFD powers 40 kVA transformer, which has motor and non-motor loads on it. Will the transformer work?

Suzlon,

2 5372

Why SF6,VCB,Oil Ckt Breakers are use in HT Side need brief information ?

Shell,

5 17340

what is the form factor of DC?

6 12814

is there any phase difference occurs while primary and secondary side mutual induction occurs?

1515

what happens when series resonance occurs?

1383

what happens when parallel resonance occurs?

2 4196

what is LOS(line of sight)?

1 3339

what is VSWR?

1 4219

what is servomechanism?

1 5578


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1420


how to calculate the distance relay faulty zone?pls explain?

1576


operation of diesel generator

1534


difference between high and low impedance BUS BAR relay??

1057


describe the Tranformer testing procedure

1453






Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?

1732


A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.

2064


We have 250 KW x 2 motors, which are load from 25% to 100% varying load in every minute , so how can we compansate the power factor. pl give your opinions on the above subject.

1411


in dc shunt motor if field winding is shorted then

1358


When we need up only in o/p 440v, so why we use directly in 11kva in input?

1268


In convertor can we use rectifier thyristor in place of invertor thyristor with explain.

1367


I want definition for ABT Meter (Availability Based tariff) ?

1515


If the earth is a good conductor of electricity, why don't people get shocked every time they walking on earth?

1296


What is Phase margin?

645


High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?

1622