how moving coil indicator works?

1 3047

how LVDT works?

2 5582

what is an oscillator?

7 7366

What is a surge supressor why its is used in synchronous generators

1522

what is High resistance grounding and whatis the criteria for the selection of High resistance grounding

MAHINDRA,

1701

magnetic circuit consume energy

3 4667

1.generator rated as 1000 mva,11kv .8 pf what will 0.8 pf will indicate? 1.max pf it can supply 2.min pf it can supply like this 4 options there what is answer.explain

Power Grid,

5 12265

1.Why hydrogen used for cooling in generators 2.Why electrical equipment protected by ground 3.Why earthing for transmission line 4.What is rms value of half wave rectified square wave. If Rms value of actual wave 2amps.

Power Grid,

1 2609

PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com

1577

why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?

Grasim,

1613

How can maintain our H.T. motors used in cement plant. please send me procedure.

4658

what is the workimg of ct &pt?

5 6732

what is the synchronous timer ? and it applications.

CPCL,

1891

i need previous entrence exam papers of nhpc.

2349

how can maintaince the acb contactor moveing and fixing kit

Gulf Cement,

1581


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.

1857


in dc shunt motor if field winding is shorted then

1358


What is an ac motor?

676


May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?

1015


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2130






What is the diffrence (Technical & Construction ) between CBCT & Normal CT?

1542


if we run a 3 phase machine on two phase what will happend??? given answer with solid reason please

1589


How many kw will suply from one db

1065


Why temperature rise is conducted in bus bars and isolators?

751


what is the difference between b c d curves on mcb

1334


hi can anyone pls tell me the eee interview core questions asked in l&t

1539


What happens if we connect a single phase energy meter in reverse polarity.

1706


describe the fully control circuit diagram of ac drives

1352


Is there chopping current in resistive circuit

1531


What is the count of hvdc transmission lines in india?

619