What is the purpsoe of FTA and MTA plumbing??? Is there any books which can provide details of lumbing fittings and its requirement??
1 20700a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to calculate it? b) If beam dimensions are 200*400mm , beam coveris 25mm , slab cover is 20mm , what will be the cutting length for stirrups? c)Column dimensions are 250*400mm , reinf. is 12nos. bar of 16mm dia , stirrups provided are two legged, what will be the length of each ring? Regards
27 1967451. why more stirrups are provided near the support? 2.where more stirrups is provided in a column and why? 3.why extra bars are provided at the top of beam? 4.what is the difference between overlap and lap lenght? 5.what is development lenght
2 29738Post New Civil Engineering Questions
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is pqc
What does civil status mean?
Explain what is the release of lien?
What are the techniques to measure road difference?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is mc arther pile?
how to clculate the %of concrete strenght achive after curing?load
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
How foundation is designed, Column design and beam design
60-70 grade of Bitumen is VG-30 ?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how clculate excavated or backfilling quantity by simpson's rule
How will be cutting in timber plate size 600*400 column size