Follow Our FB Page << CircleMedia.in >> for Daily Laughter. We Post Funny, Viral, Comedy Videos, Memes, Vines...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

How to convert sqft in cft

BEL,

11 35779

What is the purpsoe of FTA and MTA plumbing??? Is there any books which can provide details of lumbing fittings and its requirement??

1 18332

a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to calculate it? b) If beam dimensions are 200*400mm , beam coveris 25mm , slab cover is 20mm , what will be the cutting length for stirrups? c)Column dimensions are 250*400mm , reinf. is 12nos. bar of 16mm dia , stirrups provided are two legged, what will be the length of each ring? Regards

Alfaraa, Speco, Supertech, Welspun,

27 181193

can i get placement in 2nd or 3rd year in college..

2 3001

why we are condecting the slump test for concrete?

8 9389

How can we cross check the excavation and backfilling quantities.

3 7847

How much wastage we considered for cement

Jain Housing, L&T,

6 27025

how much cft in 1 bag cement.

Pinto Construction, Synergy,

9 81974

The resultant upthrust on a body partially immersed in a liquid acts through?

TNPSC Tamil Nadu Public Service Commission,

5 8906

how to calculate the weight of 6mm dia rod

Bharat Construction, Sripathi Construction,

7 22931

1. why more stirrups are provided near the support? 2.where more stirrups is provided in a column and why? 3.why extra bars are provided at the top of beam? 4.what is the difference between overlap and lap lenght? 5.what is development lenght

2 26588

what is the bar bending schdule

7 10303

How much time Required for PPR pipe network testing

1231

how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

1627

what's the formula for calculate pcc for matt(45mm aggregate)?

L&T,

1566


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

1607


how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?

1610


Why we provide hair pin for shed

1398


what is the coefficient for running feet to cft coversion both area and price

1406


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

3503






writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

973


to draw bm diagrams for portal frames under different loadings//

1999


what are the duties of Site Engineer in work site?

693


What are some structures that may be subjected to fatigue?

181


why we use aggregate,sand with cement in concrete?

6370


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1456


What Reinforcements Are Used In The Process Of Prestressing?

194


what is difference between fluidity and workability also how palsticizer works

5358


Tell me about triple point of water.

194


How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....

945