In case of tunnels (Railway) what is the way of securing a wall beam?

L&T,

1 2241

what is the significance of bending moment in a structure?

5 16188

how is shear resisted in a structure?

2 3594




what is the allowable silt content in concrete?

7 7970

what"s the purpose of damp proof course (DPC)and where it"ll provide?

4 23719

which size of box use of cement,sand,aggregate to use the m 20 concrete. i know the quantity of material cement 400 kg or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only 1 beg cement so pls give me answer . thx in advance

HCC,

4 26445

TWO EXAMPLES OF NET WORT REVENUES FROM BUILDING CONSTRUCTION

1 2311

Two types of piling

8 6704




What is IS Code ? And What is IS - 9301 ?

L&T,

1 12589

What is IS ?

4 3744

what"s the formula to calculate the water for M15 grade concrete?

4 13137

What is the difference between first angle projection and third angle projection?

Nagarjuna Construction, Elecon, CLG, JTEKT,

9 41858

What is the procedure to calculate the compaction of sand?

Aditya Birla,

2 6302

How many bricks in one cubic meter? Birck size 22.9*11.4*7.6 joint 12mm Give me answer with calculations

SVS,

8 21711

how is the wastage component in structural steel being considered while doing the reconcillation for the fabrication with returning of scrap under 1 meter length

NTPC, LIC, Tata Steel Limited,

4 13926


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

821


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

1000


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

951


What is type failure of road surface? how to repair the failure of road surface?

1095


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

945






How to make tiles floor step by step procedure?

632


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

855


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

654


How can I make justification between using concrete grade c35 compare c37?

199


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

1112


How much cum. Brick work can do by 1 madon

162


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

3775


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

809


what is meant by shear center?????

1194


How much quantity of cement,sand,stone used to build 1 cum of cc road??