how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
1456how to calculate weight of round steel bar and square steel bar, i section bar and c channel bar, angle bar
2 3439How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
1359Column is a compression member, concrete is strong in compression..then what is the reason to the column reinforcement..?
6 7651Post New Civil Engineering Questions
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is the primary difference between adsorption and absorption?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
what discoveries did you have in relation to your course?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
I have an span length 16 ft c/c
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Define What happens to Load at yielding ?
how much repeitation for conventional and maivan formwork?
what are the challenges of being a team leader and a supervisor?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
Civil engineering related
Define graphics window?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?