Answer / anand samy
Water cement ratio = weight of cement x 0.45 or 0.5 (ratio)
for example if u take 50kg cement, the water volume is
50 x 0.45 = 22.5 water is needed for concrete..
also add some percent for wastage....
| Is This Answer Correct ? | 9 Yes | 2 No |
how to calculate 162/D2 FOR TMT
What is the specification of m40 grade concrete
2 Answers Era Infra Engineering, PSU,
what do you calaculate PCC/GRADE 10
The concrete slump recommended for beams and slabs; is?
How to find the requirement of cement and sand for the 1cum of rr masonry work
how we can prevent freshly laid concrete from rain ,, What the plastering thickness for a) inner brickwork b) outer brickwork c) beams & slabs
how much tempareture are required to make liquid state of pid leed
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
What are the applications of cad?
how to compute slab reinforcements on step by step procedures??
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how can u extent the final setting time of cement?
3 Answers TNPSC Tamil Nadu Public Service Commission,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)