Answer / anand samy
Water cement ratio = weight of cement x 0.45 or 0.5 (ratio)
for example if u take 50kg cement, the water volume is
50 x 0.45 = 22.5 water is needed for concrete..
also add some percent for wastage....
| Is This Answer Correct ? | 9 Yes | 2 No |
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
calculate the cost for AAC block wall of 15cum?
How much bricks, cement
why do we not deduct volume of steel to find actual volume of concrete in practical???
Are you having any structural design experience?
4 Answers Ajnara Group, Jeyam Homes, L&T,
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
how to calculate the quantity of steel in a slab , beam and coloumn
what is mean by eccentric footing?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
0 Answers L&T, Shoba Devlopers,
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
1.WHERE THE SLAG CEMENT IS MAINLY USED. 2.FOR GOOD CONCRETE MIX OF M20 GRADE , CAN IT BE USED? 3. I WE USE FOR BRICKWORLiK AND PLASTERING ANY DISADVANTAGES?E
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)