Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
1871What expenses counted in contingencies and how much it is in related to built-up area of the building.
1833Post New Civil Engineering Questions
what is the weight of 10mm,20mm,40mm aggregate
what is civil enginnering & what you need of this course?
how to calculate the size of triangular ring in rcc column?
Howmuch bend to be provide for 200/600 BEEM
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What are the techniques to measure road difference?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how to do sudoko puzaals?
How to calculate unit weight of concrete for m40 grade.
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
what is the meaning of degreasing of the euipment or line.
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx