what is the minimum SBC of soil is required for different types of soil?

1 2253

number of standard bricks need 1 cubic meter

9 2978

form work including the props can be removed from beams only after

1 2270




We use d*d/162 formula to get the weight value of steel per m, what is 162 in this formula?

L&T,

2 4258

I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

Real Sociedad, L&T, GS Infra, First American Corporation,

1001

how to calculate the number of cement bags for basic construction..?

Gammon, Indu Projects,

3 2080

what are different grades of concrete and their classifications?

SP, Collage,

3 1937

can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

MPRDC,

738




How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?

Simplex, MNC, N J Devani Builders,

3 3457

We are working building soling work so soling thickness given 230mm but total are 50 cum. So I am purchased how meny tons is here spreading plz. Tell me

GKC Projects Limited GKCPL,

1 901

how much area can be platered by a mason for exterior

568

how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?

Sobha Developers, LiveCon,

1 992

The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

525

steam curing is not used in which cement

Student, SSC,

1 2540

in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage

1 1819


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how water proof chemicals act in concrete to avoid leek?

915


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

1644


How to calculate unit weight of concrete for m40 grade.

1892


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

304


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

2008






Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

693


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

1531


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

2479


why top layer of block work shoud be full size if any cut block adjustable than another layer?

978


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

650


reinforcement slab, beam and column formulas?

1397


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

581


Questions related to civil.engg in company

801


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

786


What is difference between code and standard and specification?