Civil Engineering Interview Questions
Questions Answers Views Company eMail

permissible compressive strength of m15 grade conc.

USIDCL,

4 3307

For a RCC section with congested reinforcement , what is the compaction factor

GMR, NBCC, Arihant, Gulf International Contracting,

2 2557

How should i calculate Cutting length of haunch bar in a raft including cover?

gdcl,

2 8688




Density of 10 mm aggrigates

BRB Construction, GPL,

4 2096

how many kg reinforcement is required for G+ 1 roof slab of 1200qf slop slab with 5 inch thickness of house.

Eversendai,

2 1846

How much steel required for 1000 sq ft slab 4" thickness.

L&T, SMC,

3 5427

Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

551

if column length is 12'(feet) then how to take ring bar on it?

AGI Infra, SIPL,

2 1855




What is the maximum strength of cub compress strength in one cub testing

Zandu Enterprises,

540

What is steel reinforcement required for 1000 sqft house as per besic RCC frame structre ?

2 1835

how many kg of 20mm, 10mm, dust available in one ton stone boulder

Nandi,

535

Whether dry volume or wet volume of concrete more but why?

Hiranandani,

1 1066

If a steel ring is 40 cm square and it's hooks are 8 dia of bar. The steel is 8mm. What is it cut length?

Saudi Oger,

8 2488

How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?

Aditya Structurals,

1 1722

which grade of steel is better for construction of building under earthquake zones ? why?

Noah Solutions,

2 2220


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

why we create short columns under grade slab?

1031


afe or not

807


How to calculate quantity of plum masonry in 1:3:7

1555


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

244


how to caluclate sienerge qty in construction in ap

1093






How much of the strength of concrete comes from post- production curing?

1706


Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design

1310


What is the difference between EPC,DBOOT and BOOT.

16930


how gradation of aggregates effect on slump of fresh concrete?

1067


where i can get material costs on weekly basis

732


types of piles detail,

1040


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

517


GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?

5576


What is difference between combin footing & rapt footing

198


what is your role of in previous company as a construction manager

815