Civil Engineering Interview Questions
Questions Answers Views Company eMail

What is most important to learn in Civil Engineers? AutoCadd,Staad, or Primavera...

3 4906

What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?

15 19891

Steel Calculation for Footing, Beam & Columns?

L&T,

1 10003




Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,

1 4108

rcc concrete grade uses

Descon,

3 9787

IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS

12 12371

what is mean by short coloumn? it is depend on the height? or dia of coloumn.?

8 10184

indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?

1 2700




why in india readymade structure is impossible in residence houses?

2 2963

what are the mixing of M10,M15,M20,M25,M30grades?

GMR,

4 12247

how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?

2 16485

briefly describe your ideal job?

Bahwan Engineering,

1 5761

WHY DID YOU CHOOSE THIS CARRIER?

2 3923

WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

955

HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

735


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

439


how to calculate testing date

296


what is diversion?

812


where can i get the previous question papers for rrb section enginerr (civil)

844


Basic questions of civil engineering

762






psc girder detail

1272


how to convert cement, sand aggregate quantity from M3 to kg with full description?

712


what could be the production cost of 1 cum of concrete by CP30 plant

394


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

1356


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

645


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

1032


What will you do if a portion of load bearing wall collapses under your supervision?

630


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

750


why is the column design?

754


length where bent up is made in slab of bridge from one end

512