how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring
Jade Software, NSP, TCS,
1 6974how much quantity of paint is required for 1 square meter wall for single and double coat..?
RK,
2 32661how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
1 6684In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
1 3495Post New Civil Engineering Questions
what is the 0 value in quantity surveying
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Technical Question of Civil Engineering
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
HOw much % of premium on DSR-2013 currently
I need to constructive work in amaraj batteries
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What is the per cu. mt. price of ready mix in Gujarat region.?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience