Follow Our FB Page << CircleMedia.in >> for Daily Laughter. We Post Funny, Viral, Comedy Videos, Memes, Vines...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick

1 2733

How do we say The LAP LENGHT is 50D to 60D ?????

3 7973

hide face come to omegle.com ful fill ur desires

1 3517

how much thick Pcc required for floor tiles

Vardhman,

3 7896

what is lever arm constent formula?

CGMSC, NSL,

1 3537

what are the stress act on circular slab?

NSL,

1 3980

how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring

Jade Software, NSP, TCS,

1 5048

what r the precaution for high in atp tempareture,low in atp tempareture

NSL,

1051

what is the thikness of binding wire please quick response

Omaxe,

9 11369

what is the density of fine sand grade-2

3 3357

what is the density of coarse sand

2 5948

how much quantity of paint is required for 1 square meter wall for single and double coat..?

RK,

2 26366

what is the procedure of plastering..?

3 5869

how much steel is required foe following components.. footing- plinth beam- column- beam- slab-

1 5004

In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?

1 2061


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

significance of specific surface area of particles?

1238


why do we provide haunches in rcc box or underpasses?

1972


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

1529


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1224


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1305






Did any of the egyptian pyramids ever fall down?

192


What is soil enforcement?

263


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

829


Why should pumping be not used in case of concreting work?

236


How much of the strength of concrete comes from post- production curing?

2142


What is the best type of wood glue?

207


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

1481


What is the Maximum %age of Steel in columns and beams ?

201


what is the name of shuttering oil used in oman

1616


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

1527