Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

How calculate the water for 1m3 concrete

DLF,

6 17547

how can we calculate cutting length of a column ring (300 x 600)

AVL, Manchanda, Vardhman,

16 129915

is it correct method to use crush sand in concrete as per is code

L&T,

1 5982

what is the weight of sand,corrse aggregate and steel,for 1cum

Gulf Asia, Jade Software, Sand,

1 14422

How can we calculate the cement Quantity in M25?

JK Associates, Vardhman, Wave Infratech,

2 7378

is excessive curing for brick work is good or bad for the walls?

Zanders Engineers,

1 2916

how to laying tarfelt on asbestos roof for leeks water?

NSL,

1 4016

how water proof chemicals act in concrete to avoid leek?

DDF Consultants, NSL,

2205

Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??

2 4385

1. why steel used in concrete

7 11532

I want to calculate the footing 90ยบ L bend as a techincaly

Construction, L&T,

2181

what is diffrence between catchment area,watershed and basin?

gdcl, Kalpataru,

2936

how many jack required in1sqm area

2 6451

when we select buildup beam

1 4191

1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?

ABR Constructions,

2 9387


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2578


what is column foundation

2337


Why is concrete cube test carried out?

1207


What is quantity of cement and sand required for 2000sqft of tiling?

2813


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

2359


Explain what are the problems one might face while having a Cantilever balcony?

1292


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

2030


what is meant by residual strain?

2300


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2817


about higyway engineering

4336


Can we apply curing compound on ceiling (slab Bottom)

748


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

1136


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2060


How many feet are in 4 square yards?

1163


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

1105