Calculate the quantity of concrete for the following. 2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m length.
13 97920What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
1 6323if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??
1 4674Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.
1 4174200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
L&T,
4 9494Post New Civil Engineering Questions
Time required for curing of wall tiles before fixing
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
At what point does a circle start losing area when being flattened?
What are the different methods for drawing an arc?
what is the type of earthing
what is the weight of 12mm aggregates?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What out turn civil works
Which are the Steel tests ?
How do you maintain water pressure?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is modular elasticity?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial