Civil Engineering Interview Questions
Questions Answers Views Company eMail

why we provide plastic sheet under lean concrete/pcc.?

2 13550

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.

Raheja, Opera, Star,

7 15738

how to calculate the steel in 500yard

Reliance,

840




how to calculate the bricks in 100yard

2 4250

point of contraflaxure

1 2870

WHILE CASTING SLAB AT WHAT LENGHT SLAB CASTING SHOULD BE STOP

5 8320

pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports

1 2335

why red bricks & cinders used in toilet sunken filling. if coarse aggreate used wat the probelem

2 18189




What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

860

how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?

Gammon,

1 1413

one MT of steel for using how much binding wire required?

5 5098

How much steel and concrit required in 1000 square feet slab?

2 11816

what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?

1 2643

waht is the range of compacting factor test result for good concreate?

1 7283

How will you reduce the concrete flow after mixing the concrete

Hi Vision,

868


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

why do we not deduct volume of steel to find actual volume of concrete in practical???

450


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

632


how to calculate the concrete mix m30 by volume

225


what is escalation?how it is done?

1196


Dear Sir What is the Contraction joint for base Slab

713






Calculation of curtain wall of box culvert

1901


1m square 20mm plastering how much of water need curing work

562


mean of NH4 pipe

1181


how many shuttering material required for 1000 sq.m built up area.

895


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

1687


20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

1156


Why should you show Client/Engineer activities clearly on the project plan?

1022


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

596


What is geopolymer based concrete?

1033


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

1184