how to calculate the bricks in 100yard

Answers were Sorted based on User's Feedback



how to calculate the bricks in 100yard..

Answer / vijendrasinh

45000 nos

Is This Answer Correct ?    5 Yes 4 No

how to calculate the bricks in 100yard..

Answer / vijay

1 yard 0.9144 meter

1 sq. meter 50 brick

1 meter 7.07

100 yard 91.4 meter

646.20 bricks

Is This Answer Correct ?    4 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

0 Answers   Biswas Enterprises,


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2 Answers  


What are the RISKS during the project construction?

0 Answers  


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

0 Answers  


Which code is used for tor & tmt steel bar?

0 Answers  






how to calculate steel for slab or footings?

0 Answers  


why main steel is to be reinforced in shorter direction in case of slab?

11 Answers   CG, ESRT, Kirloskar, Lokmat, Priya,


where do Tie beams used in foundations?

1 Answers   Architects,


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

0 Answers  


1)What is swear, swage and storm water? 2)What are the sizes of bricks based on Nominal, practical and standard? 3) What is the distinguies between the grade of cement 43, 53?

4 Answers   L&T,


what is mix design of sand cement and and aggrigate of M10 M20 M25..

2 Answers   MNC,


1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3

12 Answers   Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)