Engineering AllOther (1379) We order Dyn 5 distribution transformer to a company. What arrives is Dyn 11. Is it ok to use this transformer. It will be installed alone.
3 6314How to select the gauge of wire for winding of motors? How to select number of turns for winding of three phase induction motor?
npcc,
2740Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.
2089how to interlock 3 incomer-ACB,1 buscoupler ACB,... pls answer this question and if possible send me the ckt diagram..haifriends2910@gmail.com
2911what is the rpm of Turbocharger of Cummins KTA50G3 Diesel Engine?/ Normally What is the rpm of Turbocharger for any 1 MW Engine?
HMT,
2812
3-4 questions on optical fiber : data based.
What is Critical path in Ms-Project ?
Why 11kv to be generated in generation station
what is call flow!
What is main cause of cable's terminal point burned in Lug on high temperature although lug and cable selection is ok as per stantard and also tightness is ok as per situation. so please take in deep and tell correct answer thanku.
HOW WE CAN CORRELATE THE MA\ECHANICAL POWER TO ELECTRICAL POWER. SUPPOSE IF I WANT A PUMP OF PUMPIG 200 LPM AT 20 METER HEAD MENAS WHAT IS THE POWER NEEDED FOR PUMP IN ELECTRCAL AND HOW CAN WE GET IT
what are basic step involved in embedded system software development?
Define configuration and calibration and explain with an example
Tell me all about production of drought and its losses In the boiler?
how is the testing of an REF relay? what are the test REF circuit having?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Define stripping?
explain the rale of the government in the construction industry
Explain pathogens?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.