Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) I heard that the acetylene cylinder pressure can't be brought down below bar while using for welding activity. Is it true. . If so pl explain why
1 2276which cable is preferred PVC OR XLPE for voltage from 220V to 11 KV with proper justification
1 5018What is the best mixture ratio in building a power plant? what is the weight of a 1 sack cement? what is the density of a cement?
1 6572What is the proportioning by weight of 1:2:3 concrete mix design of cement, sand, gravel, and water in metric for a 3000 PSI concrete strength and a target slump of 75-100mm?
2 24108
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
plz send last 5 year paper set for JE-II(ELECTRICAL)Exam held on few month in mumbai
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
why and how voltage sharing in transformer, during magnetic balance test ?
hai iam selected in po exam in allahabad bank . my interview date is 02-06-2009. so plese send me some sample question on my email. my email is nitinbikhani@yahoo.com
Draw the frequency response of DARLINGTON PAIR
plz send jto previous papers
If sum one has HAL placement paper plz mail me ,I m Chemical Engg.my id is er.kotnala@gmail.com
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
Hello sir I am going to give section engineer examination and will be held in 2010. So I need all prevous years examination papers. please send it on my email id : bhalchandrap@yahoo.co.in
hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
whether anyone has VEDANTA written question papers?if so send me soon i've placements in dec 2nd week