Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Instrumentation Interview Questions
Questions Answers Views Company eMail

Hot calibrate a level transmitter (wet & dry legs)?

Honeywell, IEC,

1 3641

Instrumentation Safe Guarding test. How to determine the interval time of the test. eg:Halfyearly,Every year,Every three years etc.

2118

POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?

2292

which type inter lock use in petrochemical refinery,and oil & gas?

3025

How a oxygen sensor & analyzer work at boiler or furnace, what’s the principle & science is beyond this, How O2 sensor scene & convert signal & move toward analyzer & analyzer show reading in percent?

GS Engineering Construction, KNIC,

1 5732

How to convert mA into Percentage?

KNPC,

4 31502

A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

MNC,

2174

can i calibrate DP transmitter online (while Tx in Service) if yes ,how?

CEPC,

1 5379

I have a orifice installed in plant which is design for 0~100 inH2O for 0~80MMSCFD, now due to process change the maximum flow is change to 120 MMSCFD so for this new process value what will be the DP across orifice.

1 8370

what is positive feedback and negative feedback?

CEPC,

2 6402

without color coding, without nameplate, without multimeter how can you find the type of thermocouple???

Sabic,

1 6260

why r using 250 resistances

Sabic, Samsung,

6 11304

Explain level troll principle & interface level measurement.

ADMA OPCO,

1 5115

What is surge and how is it prevented, what is the purpose of bypass valve across AS valve.

ADMA OPCO,

1911

i want the equation of this question. Tranmitter range is 120 mmwc and dcs flow range is 1700 nm3/hr. if i want to change dcs range from 1700 to 2400 nm3/hr then how much dp i have to enter in transmitter

GMR,

2 12995


Post New Instrumentation Questions

Un-Answered Questions { Instrumentation }

Why is the orifice tab provided?

1219


Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks

2309


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

1794


hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747

1996


How can measure flow in oil line?which type of transmitter is generally used?

4214


Which language of programing is popular? how can i learn it ?

2154


Why grounding is necessary? Give example with diagram.

2218


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2335


Explain the difference between mmwc and mmwg?

5670


What are the different types of thermistors used in industries? How to the operation of typical thermistor?

1965


What is voltage regulator?

1104


What is the use of double seated valve?

1324


Hook up resistance decade box to temp.transmitter.

2293


Why we are using reverse action in displacer types level transmitters on some Vessels?

2543


why direct mounted pressure transmitters is always installed with DBB ( double bleed block) valve in process line or top of the tanks ?

2055