Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
1 4391What structure do your BOMs have? How many levels are there? How many components are there on each level?
1 5990Do your single-level BOMs represent production levels and do you keep your BOM header materials in stock? If not, do you produce non-stock items, or are some assemblies just used as structural elements in a BOM?
2 5207In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
4 8343in sap system, how to get production order record! example:i want to know who lock my production order!
5 14646If process order is technically closed, by mistake I want to process that order again can I do it?
6 11724If there are some errors in goods movements, and less stock of material consumed, how can i solve that problem in SAP.
3 10575Post New SAP PP (Production Planning) Questions
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Integration between PP and PM module.
What is the difference between pp and pp-pi? Which one is better and how ?
How mrp (material requirement planning) types are classified?
What is serial number and where you will be configure
Explain 'mrp' (material requirements planning)?
Mention what is the t-code for changing production order and to display production order?
Have you used Pull list or back flushing in REM?
What are the different type of BOM usage?
In implementation stage tell some standard scenario before AS-Is & TO-BE
Define stock requirement
Steps to configure Production order type.
Why work scheduling view is required for semi-finished and finished products?
Explain schedule margin key
How requirements( pir, sales order, customer requirement) are reduced after they are produced?