What are the basic dates?
If u maintain sub-contacting where and how will be reflect
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What is the transaction code to run MRP for sales order?
How mrp (material requirement planning) types are classified?
What are the reports generated in product cost controlling information system?
How is indian slab and us slab?
How can you create production order without routing and BoM?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
How to delete a group of products that was created in screen mc84 ?
What is time phased Planning?
Tell one biggest task for you
What is phantom item & sub contracting
What is meant by slab?
What are all the settings done for configuring the integration of pp with fico?