What is MTS and MTO and the difference between them?
what are the constraints of Variant configuration?
Checkdigit example
What is finite scheduling?
Explain PI sheet.
How costing is affected the pp?
What is detail scheduling
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How do you restrict the data to be entered in the payroll area?
How to attach a drawing for a material to bom ? Is it possible ?
How to create object dependencies in a bom for a configurable material?
What are sequence, parallel, overlapping, splitting and where can we assign these
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?