In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
879In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
1004We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
1073Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
1021We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
927Post New SAP PP (Production Planning) Questions
What is planning horizon?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
what are the constraints of Variant configuration?
What is the use of plm (product lifecycle management) in sap pp?
Which MRP types you have used?
What is MRP Area or How can I excluede one storage location stock from MRP?
What is the use of sap material view and list out other parameters where sap material view is applicable?
What are all the settings done for configuring the integration of pp with fico?
What is known as 'demand management'?
Explain Flexible Planning procedure or How many levels of Flexible planning.
How to move to the realization phase?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is the use of mrp list?
What is the planning horizon?
Explain the planning steps for 100 products?