SAP PP (Production Planning) Interview Questions
Questions Answers Views Company eMail

What are dynamic actions? Give a few examples. What are it’s you used in them?

753

In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?

715

In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?

818

How are time management and payroll are integrated?

796

What is meant by payscale structure? How did you configure the payscale structure?

760

Why the work scheduling view is required for semi-finished and finished products?

764

We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

866

How do you restrict the data to be entered in the payroll area?

803

What are the basic dates?

734

Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

817

We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?

773

What is the production process in sap?

718

What is internal payroll process?

784

How costing is affected the pp?

774

What is the use of data in work centers?

840


Post New SAP PP (Production Planning) Questions

Un-Answered Questions { SAP PP (Production Planning) }

Define mrp group

834


Mention what are the types of master views for production and planning?

750


what are Standard keys

1817


What is scope of planning?

1218


what is group bom? Is it possible to attach the drawing for a material to bom? How?

935


What is Individual and collective requirements and differecne between them in MTO scenario?

1802


What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?

1618


Define mrp list

842


What is the use of stock requirement list?

824


In the monthly lot size proc, how to generate lot at the end of Period?

4057


What is prt (production resource tools) in sap pp?

1066


You want to integrate pp with fico. What steps would you take?

742


SPRO path for order, confirmation or requirement class.

2543


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4532


Standard mrp steps

1593