Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?
1 4756Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
1 4455What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
2125Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
1 4189Do you need a complete history of your BOM changes? For what reasons (documentation, different technical states in operational areas, other)? For what types of BOMs? From what point in time (initial released status, other)?
2 21044Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
1983Describe the change process for material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, engineering change management,revision levels, synchronization with current production orders, other.
1 4888Post New SAP PP (Production Planning) Questions
Mention what is the purpose of using capacity planning?
How to create object dependencies in a bom for a configurable material?
What are the production process in sap?
What is the use of infogroups?
Integration between PP and MM Module.
Difference between byproduct and co-product.
What is purpose of schedule margin key?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Question related to Production order status or status profile?
What is meant by slab?
Define mrp controller
Explain what is sap pp?
If u maintain sub-contacting where and how will be reflect
What is planning horizon?
What is the use of stock requirement list?