Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?
1 4077Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
1 3698What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
1703Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
1 3369Do you need a complete history of your BOM changes? For what reasons (documentation, different technical states in operational areas, other)? For what types of BOMs? From what point in time (initial released status, other)?
2 19783Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
1564Describe the change process for material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, engineering change management,revision levels, synchronization with current production orders, other.
1 4144Post New SAP PP (Production Planning) Questions
Explain how can you create production order without routing and bom?
What is prt (production resource tools) in sap pp?
What is meant by payscale structure? How did you configure the payscale structure?
How do you integrate HR (employee) with PP?
How to delete a group of products that was created in screen mc84 ?
What does a PP Consultant do in his/her real time?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Why is work scheduling required for semi finished and finished products?
Explain the lsmw and the steps involved in them.
What is process keys
What are all the ‘technical types of bom’?
What is pi sheet
Can’t one material be assigned to more than one operation in a routine?
What is Planning time Fence?
How to insert an inspection checkpoint at the end of an operation?