Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answers were Sorted based on User's Feedback
Answer / v.parthiban
a1+b1+root of a1*b1*h/3 footing size 7*7m 30cm*30cm
a1=49 b1=0.12m h=.3m
49+.12+root of 49*.012 *.3/3
49.12 + 2.425*.10
51.545*.10= 5.155cum
| Is This Answer Correct ? | 14 Yes | 15 No |
Answer / umesh gumme
avg of D & d=0.5+0.15/2=0.325
size of footing 1.7*2 no of footing assume 5
no*(avg+D)*(avg+D)*(D-d)
5*(0.325+0.5)*(0.325+0.5)*(0.5-0.15)
5*0.825*0.825*0.485=1.65 m cube
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / habesingh barde
V=h/3(A1+A2+(under rootA1*A2)
where, h=hieght of trepezoidel
A1=area of lower shap
A2=area of upper shap
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / abdul kohinoor
a+b
where a= l*b*h
b= h/3[(A1*A2)+underrood A1+A2
| Is This Answer Correct ? | 4 Yes | 6 No |
Answer / ananth
h/3(a1*a2)+root of a1^2*a2^2
a1-area of bottom
a2-area of top
h-over all height
| Is This Answer Correct ? | 6 Yes | 12 No |
Answer / bibekananda mishra
Volume of Trapezoidal footing = [(B+D)/2*d]*l
= [(1.7+0.5)/2*0.15]*2= 1.1*0.15*2= 0.33Cum
| Is This Answer Correct ? | 8 Yes | 18 No |
Answer / mohan kasabe
formula:
sum of two parallel side
------------------------X perpendicular distance
2
suppose side A-2m & B-1.7
sum of D & d (.5+.15 )=0.325
(2+1.7)/2*0.325=0.601 cum.
| Is This Answer Correct ? | 20 Yes | 44 No |
how to convert sand in Cft to Kgs
Can fly ash bricks can be used in brick bat coba?
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
what is the minimum spacing required for slab & beam reinforcement
how meny typs of renging rod?
How does siphoning work?
what is means of M50,M20,M15 like this please tell me ?
Hello sir,I am preparing for GET,Jindal steel & power limited.So can u plz send me few back papers including technical & aptitude.
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.
7 Answers Opera, Raheja, Star,
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
In what construction is concrete grade m35 used?
4 Answers Cipla, High Concrete,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)