give me the mix proportion for design mix concrete M10 grade
1:4:8

Answers were Sorted based on User's Feedback



give me the mix proportion for design mix concrete M10 grade 1:4:8..

Answer / anand

1:3:6

Is This Answer Correct ?    1 Yes 0 No

give me the mix proportion for design mix concrete M10 grade 1:4:8..

Answer / jayshankar dwivedi

M10 1:3:6 and Grade is M 7.5

Is This Answer Correct ?    30 Yes 36 No

give me the mix proportion for design mix concrete M10 grade 1:4:8..

Answer / raju

what does it mean 1:3:6
is it cement:concret:sand

Is This Answer Correct ?    48 Yes 145 No

Post New Answer

More Civil Engineering Interview Questions

CM 1:4 !:5..what CM stands for?? and what is standard ratio used for external plaster??

4 Answers  


What are the basic use of runners and standards of pipelines?

0 Answers   Bechtel,


how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring

1 Answers   Jade Software, NSP, TCS,


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

0 Answers  


What are the different approaches in designing the floors of the service reservoirs?

0 Answers  






What is type failure of road surface? how to repair the failure of road surface?

0 Answers   MSEB,


How many cover blocks should be provided for 10 sq.m area?

1 Answers   Asquare,


how many AAC blocks of size 600*200*225 mm are required for 1 cu.m of area

1 Answers  


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

0 Answers  


What cantilever length can be provided safely for Galleries in a multi storey building?

1 Answers  


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

0 Answers   RS Construction,


Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)