How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

Answers were Sorted based on User's Feedback



How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / thiraviam

after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure

Is This Answer Correct ?    5 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / irfan

20

Is This Answer Correct ?    5 Yes 4 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / fayaz

27 days

Is This Answer Correct ?    4 Yes 3 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / satishkumar

after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.

Is This Answer Correct ?    1 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / manjunatha.h.s

How many days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

As per codal provision 7days curing by ponding +7 days
continues sprinking should be done, Minimum of 14 days
curing should be done to start casting a new slab upon it
therewhich Back propping should be given to the lower slab
in the column capital portions,

In case if ponding is not done, continues water sprinking
should be done for 21 days

Is This Answer Correct ?    1 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / dushyant

What about casting in 14 days?

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How to preparation billing for high rise building? anyhow can give the tips

2 Answers   L&T,


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

0 Answers  


How calculate Load Bearing Capacity of Soil?

4 Answers   MahaGenco, NBCC,


bend deductions for reinforcement for wall

2 Answers   CHD,


what is mean by bulking of sand?

1 Answers   CCCL, Mytas,






what is right time of slab DE shattering and beam boo tam.

10 Answers   L&T,


how much quantity of work we can get by rod benders per day

3 Answers   IVRCL, NCC, OWDM,


how much quantity of bending wire required for 1sqmts

6 Answers   BUP, Jade Software,


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

0 Answers  


What is Joule Brayton Cycle?

0 Answers   Bechtel,


For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?

2 Answers  


how much cement and sand required for 1cum rr masonry

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)