How to find out the quantity of steel FE415
Answers were Sorted based on User's Feedback
Answer / mohd mohsin ahmed
dia of bar and one sft is require 1.5kg of steel.....
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ganeshraj
d^2/162=unit wt of the steel kg/m
or it can be
3.1428/4*(12)^2*.00785=.879kg/m
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / xevier
(sq of dia / 162 )*( number of bar * length of bar ) gives the total quantity of steel.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / basit jogilkar
Quantity of steel =(No.of bars) (length) (weight)
Weight =(dia ^2/162)
Unit =kg
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prasanth b
suuare of dia of bar in meter/162.19=wt in tonne/m
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / kathir
square of dia of the bar devided by 162 multiply by the
dencity of fe415 stell
Is This Answer Correct ? | 4 Yes | 27 No |
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
how 2 find out slap steel quantity ? plz help me
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
why the cube depth is 150 mm which is used for testing
how many nos of National highway in India.
13 Answers HBC, L&T,
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4 ratio.
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?