How to find out the quantity of steel FE415

Answer Posted / basit jogilkar

Quantity of steel =(No.of bars) (length) (weight)
Weight =(dia ^2/162)
Unit =kg

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1468


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1343


HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

1745


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7061


How many % we consider for lap for reinforcement for estimates

1372






how many spacers we need for 1 ton reinforcement? aprox.

4923


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1662


What is meant by cad?

657


What is the diff between cad & cadd?

657


what is your role of in previous company as a construction manager

1574


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3540


how to calculate steel for slab or footings?

1200


What is the average density of soil?

683


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1497


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

1716