How much quantity of steel will be used for commercial
building consists of ground floor shops, first floor shops,
second floor will be for offices and third floor will be
office/banks. How many tons of steel is required to
construct this building.

Answers were Sorted based on User's Feedback



How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / ramesh

.12% to .15% of area of that building measurements to metric tonnes

Is This Answer Correct ?    1 Yes 0 No

How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / rajesh kumar

63Metric tons

Is This Answer Correct ?    2 Yes 2 No

How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / asc

14 tons in general for 4 storeys at 1200 sq ft/floor area

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the cutting length formula of tringle ring?

1 Answers   BPTP, JMC Projects,


what is civil engineer greatest strength and weakness?

0 Answers   Cube, NCC,


For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate

2 Answers  


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

0 Answers   AltraTech,


How gate result to cube for 7 day? Formula for the cube testing?

1 Answers   Ambuja, Indiabulls, Legacy,






is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?

2 Answers  


what is scour depth $ what's the process to determine it?

2 Answers  


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

0 Answers  


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

0 Answers   L&T,


How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3

5 Answers  


what will be the cost of constructing a plinth of (40x40x4)ft and a PCC layer of 4 inches?

4 Answers  


How we decide the depth and size of footing? Give a example?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)