which grade of concrete is the strongest?
M20,M25,M30,M35 or M40?
Answers were Sorted based on User's Feedback
Answer / vijayaraja
M40 is the high strength concrete bcz it has 40 N/mm2
strength.others are less
| Is This Answer Correct ? | 254 Yes | 15 No |
Answer / gunaseelan.s
M40......bcuase it have a high characteristic compressive
strenth attained in 28 days.....
| Is This Answer Correct ? | 157 Yes | 7 No |
Answer / nagesh raj
M- 40 is strongest It depends upon the design mix, . M-40
means its strengthis 40n/mm2
| Is This Answer Correct ? | 68 Yes | 7 No |
Answer / ravi
Strengh of M20 = 20 MPa
Strengh of M25 = 25 MPa
Strengh of M30 = 30 MPa
Strengh of M35 = 35 MPa
Strengh of M40 = 40 MPa
So, M40 has the highest strength. When the grade of concrete is directly given, mix ratio doesnt come into picture. We use proper mix to get the desired grade of concrete.
| Is This Answer Correct ? | 48 Yes | 5 No |
Answer / mani
M means mix,and numerical value give the strenth of
concrete in n/mm2.therefore higher the value of mix,higher
the compressive strenth of concrete.M40
| Is This Answer Correct ? | 34 Yes | 1 No |
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?
what is mean by reestimation?
0 Answers Ste Infrastructure Pvt Ltd,
How much percentage of brick bats allowed in CD-75 bricks
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Mean of m25 concrete
8 Answers Artech, Dream Careers, KND Engineering, L&T, Trans Concrete,
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?
What is absolute coordinates?
what is the concrete grade for 1034.13N/mmsq
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)