factory shed foundation
l=4,
b=3'
d=8' rcc foudation for top to bottom
pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
No Answer is Posted For this Question
Be the First to Post Answer
What is the significance of cost estimate knowledge for an architect?
how many covering can be taken in the beam,column & slab also stair-case?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
Why there is no use of sea water in producing electricity
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how to calculate the concrete mix m30 by volume
what is curve ranging??
what is mixed design, define it? what is way beecher?
can you provide a link for manual design of building?
what is calculation of cement, snd of 1:4 16mm,12mm plastring