factory shed foundation
l=4,
b=3'
d=8' rcc foudation for top to bottom
pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
No Answer is Posted For this Question
Be the First to Post Answer
The name priyesha Deshmukh is associated with A) literature B) shooting C) wrestling D) golf
What is meant by scaffolding coefficient?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
How many required steel of 1m3 slab casting?
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
If the design mix of M-30 grade concrete is 1:1.5:2.8 (By Weight)& W/C ratio is 0.45, then what should be the volumetric mix for the same ?
how we can prevent freshly laid concrete from rain ,, What the plastering thickness for a) inner brickwork b) outer brickwork c) beams & slabs
Water absorption for stone?
what is right & short method of measurement of slab&beam
Minimum size of the particles of silt soil
can any one tell me how to estimate the reforcement of circular slab and also for dome.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)