1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / mkumar

bricks: 485

Is This Answer Correct ?    1 Yes 0 No

1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / ashok

Sand 2.25 cm
cement 1.23 bag
Bricks 667 nod. ..

Is This Answer Correct ?    0 Yes 1 No

1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / md. mainul islam

Bricks:667 nos
Sand:16.54 cft
Cement:2.20 Bag

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate steel for slab or footings?

0 Answers  


why cylinder for split tensile strength test ?

1 Answers   HCC,


1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?

3 Answers  


what is the difference between stress and pressure??

7 Answers   Rites,


how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?

2 Answers  






what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

0 Answers   AAA, Jain Housing,


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

0 Answers   L&T,


what is the effect of earthquake on rcc columns & foundations?

2 Answers   RRB,


How Much span required for 1 sqm of shuttering(Beam & Slab)

2 Answers  


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

0 Answers  


the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles

1 Answers  


what is the procedure to clean the mivan technically?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)