when does sedimentation occur
before filteration, along with it, along with chlorination,
after chlorination?
Answers were Sorted based on User's Feedback
Answer / praveen gupta
Sedimentation occurs before filtration.
and the process is
Screening - Areation - Sedimentation - Filtration -
Chlorination
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / suresh
sedimentation should be done before the filteration because
the voids in the filter bed may get clogged if the filteration is done before the sedimentation.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pooja
sedimentation occur before filteration and by chlorination,
rate of sedimentation increases.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sunil kumar
Sedimentation is a process the treat of water .it occur
before flocatation and then provided the filtration step.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / mks
flash mixer - sedimentation - filtration - chlotination -
vaporization
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rahul
In water filtration two type of sedimentation used
1. Plain sedimentation
2. Sedimentation aided with coagulation
Is This Answer Correct ? | 0 Yes | 0 No |
what is work of planning deptt. in any construction compny (in road project)
How to hide dimensions in autocad?
What is the per cu. mt. price of ready mix in Gujarat region.?
"Why you consider yourself suitable for the post"
17 Answers Banking, CSE, IIP, IREDA, L&T, Maytas, McHugh, Nations Trust Bank, Teaching, Techkriti IIT Kanpur, Xantium Integrated Solutions,
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
What is ld in beams column and slab.
how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
how to caculate cutting lenght in bar bending schedule for 180 degree bend
what is step foundation
how the find the quantity of water used to make 1 cubic meter concrete mortor
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how