when does sedimentation occur
before filteration, along with it, along with chlorination,
after chlorination?
Answer Posted / suresh
sedimentation should be done before the filteration because
the voids in the filter bed may get clogged if the filteration is done before the sedimentation.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How much quantity of rod binding work by a rod binder per day
what are the values of compressieve strenght?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
what is civil engineer greatest strength and weakness?
very simple or less time consuming formula for reinforcement calculation by moment
Questions related to civil.engg in company
Define What is the best type of wood glue?
How can we demolish concrete beams?
What are the advantages of building a dam on the river nile?
at which depth the construction of tunnel is economical from cost and engineering aspect.
What is Heavy Concrete & Normal Concrete
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Basic civil interview questionsÂ