What does the catalystic converter on an automobile really do?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.10 : Let D be the random outcome of rolling a dice once. A new dice has values of D* = D - 3.5. There is a total of n rolls of a dice. (a) Find the variance for D* by using the formula 6 V = [ D* (D = 1) ] [ D* (D = 1) ] + [ D* (D = 2) ] [ D* (D = 2) ] + [ D* (D = 3) ] [ D* (D = 3) ] + [ D* (D = 4) ] [ D* (D = 4) ] + [ D* (D = 5) ] [ D* (D = 5) ] + [ D* (D = 6) ] [ D* (D = 6) ]. (b) Calculate the standard deviation of D* as a square root of V. (c) Another new dice has values of D** = kD*. (i) Find the value of k so that D** has a standard deviation of 1. (ii) Find the values of D** for each outcome of D = 1, 2, 3, 4, 5 and 6, when the standard deviation is 1. (iii) Given that the average score of a dice is 3.5, find the equivalent, new and improved model of a dice, Sn in term of n and D**. (iv) Find the expected value of D** as the average of D**.

1 Answers  


Explain the some guidelines for sizing a psv for a fire scenario on a vessel in a refinery service?

0 Answers  


What are the steps involved in wine making?

2 Answers   Aramco,


what is the speed of a rotary drier

3 Answers  


What are the various utilities of the process plant?

0 Answers  






How can you separate hydrogen peroxide into hydrogen and oxygen?

0 Answers  


What is a good source of equations for calculating discharge flowrates from accidental releases?

0 Answers  


What are some good strategies for curing tube vibration in shell and tube exchangers?

0 Answers  


what is fund flow definition

1 Answers   Amara Raja,


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?

1 Answers  


UNIT OPERATION - EXAMPLE 9.3 : In the distillation of binary systems by Mc Cabe Thiele method, the equation for the line of top section is given by y = [ R / (R + 1) ] x + XD / (R + 1). 2 points on the line are (0.99, 0.99) and (0, 0.36). Find the reflux ratio of R and XD.

1 Answers  


Is four stage graphite steam jet ejector is possible. Any body can provide its design

0 Answers   Atul,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)