i need formula for calculating discharge of river, the data
i have is variation of water pressure, variation of air
pressure,depth of water and length of river. please i need help
Answer / virendra
q=discharge=C0 * V0 UNDERROOT(g *2deLTa H)/1-BETA REST TO FOUR
Is This Answer Correct ? | 0 Yes | 0 No |
What are the steps taken to operate a tank-blanketing valve?
Explain what are the methods involved to test helium leak testing in a vacuum system?
hai....i am chandrika. if anybody having test questions for HAL,HPCL,ONGC,IOL...PLS SEND THE QUES WITH SOLVED ANSWERS TO ME TO MY MAIL ID chandrismiles@yahoo.co.uk
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.11 : Let an Accounting Equation to be : Assets = Liabilities + Equity of Owner. In a biochemical engineering organization, its account balance sheet contains the following information : Accounts payable $2200; accounts receivable $1500; line of credit $500; cash $100; long term debt $3800; inventory $1300; investments $800; plant equipment $6800. Find the equity of owner by applying Accounting Equation.
How to calculate the release flowrates from pressurized gas systems?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.
Do you have any idea on recombinant protein expression?
What is the difference between coagulation and flocculation in water treatment plant?
What do we use carburizing/nitriding chemicals for?
Explain what are the problems that are associated with the expansion joints?
hi can anyone tell me some technical questions asked in iocl